Off-the-shelf CRMs hand you 200 fields you will never use and none of the three you need. We build the CRM around your pipeline: your stages, your pricing rules, your permissions, your client portal, your reports, wired to the tools you already run on. Salesforce, HubSpot and Zoho are good products. They are just not shaped like your business, and the gap gets expensive once you are paying a consultant every quarter to hold them in a shape they resist.
Stop bending your process to fit someone else's CRM.
A CRM built around your pipeline, your permissions and the client portal your customers actually log into. Most teams do not need one. Some very much do.
Your pipeline lives in a spreadsheet because the CRM never matched how you sell
Per-seat license fees climb every year for features nobody opens
Customer data sits in one system, invoicing in another, and nothing reconciles
Your stages, your fields, your pricing rules, not a vendor's idea of a sales cycle.
Reps see their accounts, managers see the team, finance sees the money. Enforced server-side.
A logged-in view for customers to track jobs, approve work and pull their own invoices.
The dashboards your managers ask for, plus CSV and Excel export, because ops always needs the data out.
A tight, low-risk path from first call to something running in production.
We follow your real process, including the parts held together by habit.
Data model and permissions first. Those are the expensive parts to change later.
Shipped in reviewable increments you can use before it is finished.
Tests on auth and billing, a runbook, and the repository signed over to you.
Auth, billing, and anything touching money. Those fail in CI, not on a customer's invoice.
Architecture notes, setup instructions and a deployment runbook. Written, not promised.
Because ops teams always need the data out, and always need it sooner than you planned.
In your repository, from the first commit. No license, no lock-in, no hostage situation.
For most teams you should not, and we will say so. Off-the-shelf wins when your process is standard. Custom wins when the process is the business: usage-based pricing, approvals that cross departments, rules no vendor anticipated. Past that point, licenses plus a consultant to hold it in shape cost more.
One price, agreed at discovery and written down before you sign, and a first production version typically takes four to eight weeks. A single integration or a fix to something already running is a much smaller piece. The number moves with how many roles need their own permissions.
A first version that replaces a spreadsheet and runs a real pipeline is typically four to eight weeks, not quarters. We scope it so something useful is in your team's hands early, then extend it from there. You get a realistic timeline out of the first call rather than a flattering one.
Yes, and that is usually the point. We have wired production systems to Stripe, Clover, Twilio, RingCentral, SendGrid, Google Maps, WhatsApp and Pusher, alongside standard REST and webhook integrations. If it has an API, it can be part of the CRM. If it does not, we will say so before you plan around it.
You do, from day one, in your own repository. There is no license and no lock-in. If you ever want to move it to another team, everything they need is already written down: architecture notes, setup instructions and a deployment runbook that has been used.
That is a normal outcome and the handover is built for it. Because the code is already yours and already documented, an in-house hire or another studio can pick it up without a discovery phase. We would rather you leave cleanly than stay because leaving is painful.
Usually, and it is part of the build rather than a line item afterwards. Exports from Salesforce, HubSpot, Zoho or a pile of spreadsheets get cleaned, mapped to the new model and loaded, with a dry run you check before anything goes live. Messy history is normal and we plan for it.
Describe what you’re building, what it has to do and when it needs to be live. You’ll get back the architecture we’d use, the trade-offs, and a realistic timeline, before anything is signed.